احداث سیستم دوم بارگیری کنسانتره به قطار در مجتمع سنگ آهن چادرملو
-
- کارفرما:شرکت معدنی و صنعتی چادرملو
- پیمانکار:شرکت فکور صنعت
-
- طراحی پایه
- طراحی تتفصیلی
- مهندسی خرید
-
- Feeding the loading station silo by belt conveyor Operation capacity of iron ore concentrate: 2500 t/hr
- Storage of 1000 tones of Iron ore in steel rectangle silo.
- Train loading via weighing bin by four mushroom valves, operating capacity: 4500 t/hr
- Record and report the loading data and history based on client’s requirements
- Molasses spraying on loaded material on train for covering and stabilizing the concentrate
-
- Bin
- Hopper
- Belt Conveyor
- Loading valves
- Loading bins
- Hydraulic system