Non-ferrous Mineral Projects
- Zirab Coal Plant No 2
- Abbas Abad Copper Plant No 1
- Taj Koh Concentrate Plant No 1
- Siah Kamar Plant No 1
- Rangraz Concentrate Plant No 1
- Second Gyratory Crusher in Sarcheshmeh
- Darre Alou Preliminary Crushing Unit
- Copper Ore Sorting in Abbas Abad
Alborz Markazi Coal Washing Plant
- RoNaK Client: Fakoor Sanat Tehran & Kavoshgaran Joint Venture
- Main Client: IMIDRO Company
- Feed Capacity: 500,000 TPY
- Product Capacity: 350,000 TPY
- Scope Of Work: Conceptual Design, Basic Design, Detail Design, Purchasing Engineering
- Project Status: In Operation
Copper Concentrate Production from Abbas Abad Copper Mines
- RoNaK Client: Meskavan Abbas Abad Company
- Feed Capacity: 350,000 TPY
- Product Capacity: 5,500 TPY
- Scope Of Work: Conceptual Design, Basic Design, Detail Design, Project Supervision
- Project Status: In Operation
Lead & Zinc Concentrate production Plant from Yazd Taj Koh Mine
- RoNaK Client: Madan Ara Falat Aria Company
- Main Client:Aria Fateh Holding
- Feed Capacity: 100,000 TPY
- Scope Of Work: Conceptual Design, Project Management, Basic Design, Detail Design, Purchasing Engineering, Supply Of Equipment, Construction, Project Supervision
- Project Status: In Operation
Implementation of Molybdenum Concentrate Plant in Siah Kamar Copper Mine
- RoNaK Client: Aria Kanser Samin Company
- Main Client:Aria Fateh Holding
- Feed Capacity: 500,000 TPY
- Product Capacity: 350,000 TPY
- Scope Of Work: Conceptual Design, Project Management, Basic Design, Detail Design, Project Supervision
- Project Status: Stopped
Copper Cathode Production Plant in Saveh
- RoNaK Client: Zarmesh Group
- Capacity: 2,500 TPY
- Scope Of Work: Conceptual Design, Project Management, Basic Design, Detail Design, Purchasing Engineering, Supply Of Equipment, Construction, Project Supervision
- Project Status: In Operation
Implementation of Second Gyratory Crusher in Sarcheshmeh Copper Complex
- RoNaK Client: IBCCO
- Main Client: National Iranian Copper Industries Company
- Capacity: 7,000 T/H
- Scope Of Work: Basic Design, Detail Design, Purchasing Engineering, Project Supervision
- Project Status: Stopped
Implementation of Darre Alou Preliminary Crushing Unit
- Main Client: National Iranian Copper Industries Company
- Capacity: 1,500 T/H
- Scope Of Work: Basic Design, Detail Design, Purchasing Engineering
- Project Status: In Operation
Copper Ore Sorting & pre-enrichment by XRT Methode in Abbas Abad Copper Mine
- RoNaK Client: Meskavan Abbas Abad Company
- Capacity: 500,000 TPY
- Scope Of Work: Conceptual Design, Project Management, Basic Design, Detail Design, Purchasing Engineering, Supply Of Equipment
- Project Status: In Operation