Board of Directors

Majid Arabi

CEO and Member Of The Board
Education
  • M.Sc in Mechanical Engineering (Energy Conversion)
  • B.Sc in Mechanical Engineering (Fluids Mechanic)
Work Experience (Companies)
  • RoNaK Co. (2013-up to Now)
    • Companys Work Scope: Engineering Company in the field of Mining Industrial Project
    • Last Position: Managing Director

  • Fakoor Sanat Co. FSTCO- (2006-2013)
    • Companys Work Scope: EPC Company in the field of Iron Ore and Copper Industrial Projects.
    • Last Position: Engineering Deputy

  • GOL-E-GOHAR Iron Ore Co. (2004-2006)
    • Companys Work Scope: Produce of Iron Ore Concentrate and Pellet and The Client of
    • Last Position: Vice-Manger of Engineering Department

  •  Managan Process Equipments Co. (1999-2003)
    • Companys Work Scope: Design, Manufacturer and Erection of the Chemical and Mining Beneficiation Equipments.
    • Last Position: Managing Director

  • Mangan Machinery Co. (1995-1999)
    • Companys Work Scope: Design, Manufacturer and Erection of Cement and Mining Industrial Equipments.
    • Last Position: Project Manager.
Work Experience (Projects)
  • The Different Projects of Design, Manufacturer and Erection of the Chemical and Mining Beneficiation Equipments (Managan Process Equipments Co.).
  • Implementation of GOL-E-GOHAR Hematite Recovery Plant (GOL-E-GOHAR Iron Ore Company).
  • EPC Implementation of Kordestan-Shahrak 1MTPY Crushing (FSTCO).
  • EPC Implementation of Khaf-Sangan 1MTPY Crushing and Enrichment (FSTCO).
  • EPC Implementation of CHADORMALU Molasses Spray System (FSTCO).
  • ARDAKAN Pelletizing Plant Truck Unloading System (FSTCO).
  • EPC Implementation of SIRJAN Tailing De-Watering Unit- SISCO- (FSTCO).
  • EPC Implementation of CHADORMALU Concentrate Tailing Recovery Project - (FSTCO).
  • EPC Implementation of GOHARZAMIN 6 MTPY Concentrate Plant (FSTCO).
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant Line 2- SISCO II- (FSTCO).
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant-SISCO- (FSTCO).
  • EPC Implementation of GOL-E-GOHAR 2 MTPY Concentrate Plant - POLYCOM- (FSTCO)
  • All of the Current and Finished Projects in RoNaK Co. (See the RoNaKs Project List.).
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant-ZISCO- (FSTCO).
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant Line 2- ZISCO II- (FSTCO).
  • EPC Implementation of GOL-E-GOHAR 6 MTPY Concentrate Plant - GOLFA- (FSTCO).
  • EPC Implementation of GOL-E-GOHAR Tailing De-Watering Unit- POLYCOM Completion Project (FSTCO).
  • EPC Implementation of GOL-E-GOHAR Crushing, Stacking, Reclaiming and Concentrate Stockpile Units - POLYCOM Completion Project - (FSTCO).
  • EPC Implementation of Khuzestan Steel Company Mechanized Truck Unloading System (FSTCO).
  • EPC Implementation of CHADORMALU Emergency Depot Reclaiming and Truck Loading System (FSTCO).
  • EPC Implementation of ARDAKAN Pelletizing Blaine Increasing Unit (FSTCO).
  • EPC Implementation of Jalal Abad 0.78MTPY Crushing and Enrichment (FSTCO).
  • Implementation of GOL-E-GOHAR Pelletizing Plant I (GOL-E-GOHAR Iron Ore Company).
  • The Different Projects of Design, Manufacturer and Erection of the Chemical and Mining Beneficiation Equipments (Managan Process Equipments Co.).
  • The Different Projects of Design, Manufacturer and Erection of Cement and Mining Industrial Equipments (Mangan Machinery Co.).

 

Ata Badrikoohi

Engineering Deputy and Member Of The Board
Education
  • B.Sc in Civil Engineering 
Work Experience (Companies)
  • RoNaK Co. (2013-up to Now)
    • Company activity fields: Engineering and EPC Company in the field of Mineral processing and Mining Industrial Project
    • Last Position: Engineering Deputy
  • Fakoor Sanat Tehran Co. (FSTCO) (2006-2013)
    • Company activity fields: EPC Company in the field of Iron Ore and Copper Industrial Projects.
    • Last Position: Manager of Civil, Structure and Architectural Department

  • Momtazan Industrial Co. (2004-2006)
    • Company activity fields: Implementation of Cement and Mining Industrial Projects.
    • Last Position: Executive Manager

  • Mangan Machinery Co. (2002-2004)
    • Company activity fields: Design, Manufacture and Erection of Cement and Mining Industrial Equipment
    • Last Position: Workshop Manager

  • Karnay Co. (2000-2002)
    • Company activity fields: Implementation of Building Projects
    • Last Position: Workshop Manager

  • ARSAN Consulting Co. (1998-2000)
    • Company activity fields: Consulting in Structure and Building Projects
    • Last Position: Civil Engineer

  • KAMIR Co. (1996-1998)
    • Company activity fields: Paper Production Plant
    • Last Position: Workshop Manager
Work Experience (Projects)
  • All of the Current and Finished Projects in RoNaK Co. (Check the RoNaK Project List)
  • EPC Implementation of GOL-E-GOHAR 2 MTPY Concentrate Plant - POLYCOM- (FSTCO)
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant-ZISCO- (FSTCO).
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant-SISCO- (FSTCO).
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant Line 2- ZISCO II- (FSTCO).
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant Line 2- SISCO II- (FSTCO).
  • EPC Implementation of GOL-E-GOHAR 4 MTPY Concentrate Plant - GOLFA- (FSTCO).
  • EPC Implementation of GOHARZAMIN 4 MTPY Concentrate Plant (FSTCO).
  • EPC Implementation of SANGAN 2.5 MTPY Concentrate Plant-kaveh East Steel- (FSTCO).
  • EPC Implementation of GOL-E-GOHAR Tailing De-Watering Unit- POLYCOM Completion Project (FSTCO).
  • EPC Implementation of CHADORMALU Concentrate Tailing Recovery Project - (FSTCO).
  • EPC Implementation of GOL-E-GOHAR Crushing, Stacking, Reclaiming and Concentrate Stockpile Units - POLYCOM complementary Project - (FSTCO).
  • EPC Implementation of SIRJAN Tailing De-Watering Unit- SISCO- (FSTCO).
  • EPC Implementation of Khuzestan Steel Company Mechanized Truck Unloading System (FSTCO).
  • ARDAKAN Pelletizing Plant Truck Unloading System (FSTCO).
  • EPC Implementation of CHADORMALU Emergency storage Reclaiming and Truck Loading System (FSTCO).
  • EPC Implementation of CHADORMALU Molasses Spray System (FSTCO).
  • EPC Implementation of ARDAKAN Pelletizing Blaine Increasing Unit (FSTCO).
  • EPC Implementation of Khaf-Sangan 1MTPY Crushing and Enrichment (FSTCO).
  • EPC Implementation of Jalal Abad 0.78MTPY Crushing and Enrichment (FSTCO).
  • EPC Implementation of Kordestan-Shahrak 1MTPY Crushing (FSTCO)
  • The Different Projects of Design, Manufacture and Erection of Cement and Mining Industrial Equipment (Mangan Machinery Co.).
  • Pasdaran Building Complex (Karnay Co.)
  • Design Different Structural and Building Project (ARSAN Consulting Co.).
  • Implementation of Paper Plant in SOME-E-SARA-GILAN (KAMIR Co.)

 

Alireza Sepahi

Planing and Development Deputy and  Chairman Of The Board
Education
  • M.Sc in Industrial Engineering 
  • B.Sc in Industrial Engineering 
Other Expertise and Professional Certificate
  • Project Management Professional (PMP) from U.S Project Management Institute PMI 
Work Experience (Companies)
  • Raybod Ravesh Engineering Group Co. (2017 - Up To Now)
    • Company activity fields: Consulting & Development in Industrial Engineering & IT Solutions
    • Last Position: CEO
  • RoNaK Co. (2013 - Up To Now)
    • Company activity fields: Engineering and EPC Company in the field of Mineral processing and Mining Industrial Project
    • Last Position: Planning and Development Deputy

  • Fakoor Sanat Tehran Co. (FSTCO) (2006 - 2013)
    • Company activity fields: EPC Company in the field of Iron Ore and Copper Industrial Projects.
    • Last Position: Head of Planning and Budgeting Division in Engineering Department

  • TQM Co. (2006 - 2008)
    • Company activity fields: Consult in Management Systems implementation
    • Last Position: Project Manager

  • Pars Akhgar Co. (2005 - 2006)
    • Company activity fields: Design, Manufacture and Erection of Electrical Structural Equipment
    • Last Position: Planning and Project Control Engineer.
Work Experience (Projects)
  • All of the Current and Finished Projects in RoNaK Co. (Check the RoNaK Project List)
  • EPC Implementation of GOL-E-GOHAR 2 MTPY Concentrate Plant-POLYCOM (FSTCO)
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant-ZISCO (FSTCO)
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant-SISCO (FSTCO)
  • EPC Implementation of ZARAND 2 MTPY Concentrate Plant Line 2-ZISCO II (FSTCO)
  • EPC Implementation of SIRJAN 2 MTPY Concentrate Plant Line 2-SISCO II (FSTCO)
  • EPC Implementation of GOL-E-GOHAR 4 MTPY Concentrate Plant-GOLFA (FSTCO)
  • EPC Implementation of GOHARZAMIN 4 MTPY Concentrate Plant-GZICO (FSTCO)
  • EPC Implementation of SANGAN 2.5 MTPY Concentrate Plant-Kaveh East Steel (FSTCO)
  • EPC Implementation of GOL-E-GOHAR Tailing De-Watering Unit-POLYCOM complementary Project (FSTCO)
  • EPC Implementation of CHADORMALU Concentrate Tailing Recovery Project (FSTCO)
  • EPC Implementation of GOL-E-GOHAR Crushing, Stacking, Reclaiming and Concentrate Stockpile Units POLYCOM complementary Project (FSTCO)
  • EPC Implementation of SIRJAN Tailing De-Watering Unit-SISCO(FSTCO).
  • EPC Implementation of Khuzestan Steel Company Mechanized Truck Unloading System (FSTCO)
  • ARDAKAN Pelletizing Plant Truck Unloading System (FSTCO)
  • EPC Implementation of CHADORMALU Emergency Storage Reclaiming and Truck Loading System (FSTCO)
  • EPC Implementation of CHADORMALU Molasses Spray System (FSTCO)
  • ARDAKAN Pelletizing Plant Truck Unloading System (FSTCO).
  • EPC Implementation of CHADORMALU Emergency Depot Reclaiming and Truck Loading System (FSTCO).
  • EPC Implementation of CHADORMALU Molasses Spray System (FSTCO).
  • Design and Planning of IMS Standards (ISO 9001/ISO 14001/OHSAS18001) in Different Companies such as Petrochemical Plants, Cement Plants and Governmental Companies (TQM Co.)
  • Design and Planning of Quality Management and other Management Standards (ISO 9001 /TS 29001/ISO 10002) in Different Companies such as EPC and Consulting Companies (TQM Co.)
  • Implementation of Electrical Structural Equipment in Different Cement Plants (Pars Akhgar Co.)
  • Implementation of Electrical Structural Equipment in South of PARS Phase 9 , 10 (Pars Akhgar Co.)
  • Implementation of Electrical Structural Equipment in ARDAKAN Pelletizing Plant (Pars Akhgar Co.)
  • Implementation of Electrical Structural Equipment in SARCHESHMEH Copper Sulfuric Acid Plant (Pars Akhgar Co.)

 

Hossein Mehrpoyua

Business Development Deputy and Member Of The Board
Education
  • PhD Mineral Processing Engineering, Tarbiat Modatres University, Iran, Tehran, 2014
  • M.Sc In Master of in Mineral Processing Engineering, Tarbiat Modatres University, Iran, Tehran, 2008
  • B.Sc. In Mining Engineering, Yazd University, Iran, Yazd, 2006
Professional background
  • RoNaK Engineering Co. Iran. (Engineering and EPC contractor in mining and metal)
    • Position: Business Development Manager, Manager of Process Discipline, Project Manager, Sep 2014 –present 
    • Duties: Working in both sales and project department along with conceptual design supporting the plant design department.
    • Business development manager for engineering, MC and EPC projects in the market of mineral processing industries in Iran. Based on this role, the company awarded more than 10 projects in Iran.
    • Project manager: Responsible as a project manager in 6 engineering and MC projects duration 4 years.
    • Manager of process discipline, as a starting point of each project from process discipline the responsibility is the conceptual and basic design. During this Role, company designed more than 15 projects …
  • Ase Sanat Engineering Co., Engineering Co. In Mineral processing field.
    • Position: Process Expert, Duration: Aug. 2013- Aug. 2014
    • Duties: Process Expert in Engineering team (Mostly as Client’s consultant) in implementation of iron, lead and zinc plants in Iran.
  • Madankav. Engineering Co., In Mine and Mineral processing field.
    • Position: Process Expert, Duration: Dec. 2010- Aug. 2013
    • Duties: Process Expert in Engineering team (Mostly as Client consultant) in implementation of iron and coal washing plant in Iran.
  • Tehran Padir Engineering Co., in Mining field.
    • Position: Responsible for performing laboratory mineral processing tests, Duration:. 2007- 2010
Specific expertise
  • Process Design:
    • Conceptual design of beneficiation plants mostly Iron and some base metals such as Copper, Lead and Zinc.
      Including management of laboratory and pilot plant tests, prepare some alternative circuits for each plant (base on the ore type), define required laboratory tests,  extract optimized plant’s circuit (base on CAPEX and OPEX parameters), management of perform of pilot plant test lead to extract of required data for designing of beneficiation plant, provide block diagram and mass balance and primary selection of the main equipment.
    • Basic Design: Prepare of Process Flow diagram including of mass balance, Piping & instrument Diagram (P&ID), preparing summary of equipment list, sizing of main process equipment, prepare inquiry for supply of main equipment.  
  • Project Management:
    • Demonstrate the ability to work across all facets of the project, from initial conceptual design through to commissioning and client handover.
    • Project manager for contracts, Deals with all day-to-day transactions, according to defined guidelines
    • Predict project earnings in the future by using statistic calculations of the sales contract for each project, Conduct Costing analysis, Conduct and prepare Cash flow for foreign procurement of each project
    • Invoicing to the customer, arrangement of service people, PO preparation, HSE formalities, Control execution of local contracts, …
    • Developing and tracking monthly fiscal plans for foreign procurement of each project
  • Business Development:
    • Market segmentation, Positioning, Market survey, Identifying new sales leads,
    • Researching organizations and individuals online (especially on social media) to identify new leads and potential new markets, Planning and overseeing new marketing initiatives
    • Event organizing, marketing presentation & marketing material preparation, Attending conferences, meetings,
FaLang translation system by Faboba