Projects

Coal Washing Plants

‚ŚÚűŗˇ ‚ŗŽĢÚŗ ÓŠžŚŪ ŮŠŚūŠŗŪÍ

EPC implementation of second coal washing plant for Central Alborz Coal Co. (CACCo.) (Alborz Markazi)

Main Client: Central Alborz Coal Co.

Main Contractor: Fakoor Sanat and Kavoshgaran Consortium (FAKOOR-KAVOSH)

RoNaKCo’s Client: KAVOSHGARAN Co.

RoNaKCo’s Work Scope: Basic design, detail design and engineering management of project.

Consulting Services

  • Consulting services for planning and development deputy of GOL-E-GOHAR Iron Ore Co.

          Client: GOL-E-GOHAR Iron Ore Co.

          Project Scope: Technical and engineering consulting services for improvement or development of current Projects, commissioned Plants and also some basis projects in  GOL-E-GOHAR Iron Ore Complex.

Copper projects

Meskavan

  • MESKAVAN ABBAS ABAD Copper Complex

           Client: Meskavan Abbas Abad Co.

           Basic Engineering, Technical Consulting and Project Management Services for Implementation of MESKAVAN ABBAS ABAD Copper Complex.

 

  • NICICO mine development project

          Client: Behkav Hamkar Company

          Engineering & Design of Geo-metallurgical studies

 

  • Basic and Detail Engineering for Gyratory Crushing system of Sarcheshmeh Copper complex, NICICO.

           Client: Behkav Hamkar Company ,

           Main Client: Sarchechmeh Complex, NICICO

           Engineering, Consultancy and Other Requires Services 

 

  • Basic Engineering and consultancy for Increasing capacity of crushed ore material handling system from Gyratory crusher to stock pile for Sarcheshmeh Copper complex, NICICO.

          Client: Behkav Hamkar Company ,

           Main Client: Sarchechmeh Complex, NICICO

          Engineering, Consultancy and Other Requires Services 

 

  • Implementation of material handling system for ore and mining tail and transfer from second Gyratory crusher to their stock pile and tailing dam in Sarcheshmeh Copper complex, NICICO.

          Client: Behkav Hamkar Company 

          Main Client: Sarchechmeh Complex, NICICO

          Engineering, Consultancy and Other Requires Services 

Iron ore Concentrate plants

 

  • JALAL ABAD 620,000 TPY Iron Ore Concentrate Plant from Hematite Iron Ore

          Client: Fakoor Sanat Co. (FSTCO)

          Design and Engineering, Procurement Management, Construction, Erection and Commissioning for Implementation of Concentrate Plant from JALAL ABAD  Hematite Iron Ore.

 

  • Design and engineering (Phase I) for AK KAHOR Iron Ore concentrate plant.

           Client: AK KAHOUR Iron Ore Company.

           Project Scope: Conceptual design, basic design and cost estimation for implementation of AK KAHOUR concentrate plant.

 

  • Design and engineering (Phase I) for Tailing De-Watering unit of Chador Malu Iron Ore concentrate plant 

          Client: Fakoor Sanat Co. (FSTCO)

          Project Scope: Civil and layout drawing ,basic design for implementation of Tailing De-Watering Plant 

 

  • SIRJAN Concentrate Re-Grinding Unit (Blaine Increasing)

          Client: Meyar Sanat Co. (MEMSECO)

          Main Client: Sirjan Iranian Steel Co. (SISCO)

         Conceptual Design, Basic Design, Detail Design, Engineering Services of Procurement and Field Engineering for Implementation of SIRJAN Concentrate Re-Grinding Unit (Blaine Increasing)

 

  • Engineering studies and conceptual design of Iron ore concentrate plants in low grade Iron ore mines

          Client: Golgohar Investment and development co.

 

  • Engineering & Design works for increasing Iron ore Concentrate Specific Surface in ICIOC 5 mtpy Sechahoon pelletizing plant

          Client: Iran Central Iron Ore Co. (ICIOC)

          Conceptual Design, Basic Design, Detail Design, Engineering Services of Procurement and Field Engineering for Implementation of increasing Iron Ore concentrate specific surface in 5 MTPY Sechahoon pelletizing plant

 

  • Construction 3.4 milion ton of iron concebtrate plant Industrial Pasargard Steel Complex

          Engineering design and production of concentrate processing plant with a capacity of three milion and four hundred thousand tons per year

 

  • 300 tons of iron concentrate plant, aria jonoob iranian company

          Perform all engineering design work and part of the Executive work processing plant and concentrate production

 

Iron Ore Pelletizing Plants

Replacement and improvement of mixer unit in GOL-E-GOHAR pelletizing plant I.

Main Client: GOL-E-GOHAR Iron Ore Co.

Main Contractor: NAMVARAN Co.

RoNaKCo’s Client: NAMVARAN Co.

RoNaKCo’s Work Scope: Basic and detail design of project.

Material Handling System

  • Design and engineering of material handling system for different Iron ore concentrate plants.

           RoNaKCo’s Client: Fakoor Sanat Co. (FSTCO).

                  - Basic and detail design for a part of material handling system in ZARAND 2MTPY concentrate plant (ZISCO line II).

                  - Basic and detail design for a part of material handling system in SIRJAN 2MTPY concentrate plant (SISCO line II).

                  - Basic and detail design for a part of material handling system in GOL-E-GOHAR 4 MTPY concentrate plant (GOLFA).

                  - Basic and detail design for a part of material handling system in GOHAR ZAMIN 4 MTPY concentrate plant. (GZICo.)

 

  • Design and engineering of material handling system for SANGAN pelletizing plants II.

          Main Client: SANGAN Steel and Iron Ore Co.

          Main Contractor: AZARAN Co.

          RoNaKCo’s Client: AZARAN Co.

 

Pelletizing Plants

Replacement and improvement of mixer unit in GOL-E-GOHAR pelletizing plant I.

Main Client: GOL-E-GOHAR Iron Ore Co.

Main Contractor: NAMVARAN Co.

RoNaKCo’s Client: NAMVARAN Co.

RoNaKCo’s Work Scope: Basic and detail design of project

Renewable Energy

Train/Truck Loading and Unloading Mechanized Systems

CHADORMALU train loading mechanized system.

Project Main Client: CHADORMALU Mining and Industrial Co.

Main Contractor: Fakoor Sanat (FSTCO).

RoNaKCo’s Client: Fakoor Sanat (FSTCO).

RoNaKCo’s Work Scope: Basic design, detail design and engineering management of project.

Project Planned Finish Date: July 2014.

  • No.6, 10th Alley, Mirzaye Shirazi Ave, Motehari St., Tehran, Iran
  • +98 -21 -8891 -6330
  • +98 -21 -8891 -6330
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Projects Photo

Top