Train/Truck Loading and Unloading Mechanized Systems

CHADORMALU Train Loading System

  • Client: CHADORMALU Mining and Industrial Co.
  • Main Contractor: Fakoor Sanat (FSTCO)

Conceptual, basic & detail design, Procurement engineering and engineering management of Train loading station of Chador Malu complex with 4500 TPH operation Capacity

  • Scope of work:
    • Project management,
    • Basic Engineering
    • Detail Engineering (All disciplines : civil, plant design, process, piping & utilities, material handling & mechanical, Electrical , Control and instrumentation )
    • Procurement Engineering
    • Engineering support at site

  • Process Summary:
    • Feeding the loading station silo by belt conveyor Operation capacity of iron ore concentrate: 2500 t/hr
    • Storage of 1000 tones of Iron ore in steel rectangle silo.
    • Train loading via weighing bin by four mushroom valves, operating capacity: 4500 t/hr
    • Record and report the loading data and history based on client’s requirements
    • Molasses spraying on loaded material on train for covering and stabilizing the concentrate

  • Key Equipment :
    • Bin
    • Hopper
    • Belt Conveyor
    • Loading valves
    • Loading bins
    • Hydraulic system 

  • No.6, 10th Alley, Mirzaye Shirazi Ave, Motehari St., Tehran, Iran
  • +98 -21 -8891 -6330
  • +98 -21 -8891 -6330
  • This email address is being protected from spambots. You need JavaScript enabled to view it.
Top